Clients & projects we've undertaken

Proof of the pudding!

affinity testimonials
We take pride in providing the very best solution taylored to our clients individual needs.

Our experience and dedication is proof of the pudding; we'll do all we can to ensure you receive excellent customer care.

Nothing speaks louder than words...enquiry 

 

"Affinity has helped our business grow and given us excellent IT support"

.........................................................................................................................................................................................................

Newcastle Airport  Affinity Microwave Link Case Study
 
  • In depth site survey & radio test prior to order
  • Long range Ethernet 1.4GHz System
  • Licenced System offers interferance immunity
  • Mounted directly to Control Tower
  • 3 Year virtual spares contract for on site engineering support
  • Post installation Engineering Training
 Newcastle Airport Microwave Link>
 

 

Wide Area Multi Lateration System  - Affinity Microwave System forms part of new and innovative Air Traffic Control Aid. A Turnkey Solution including instalation, training and maintenance & support. 

"Affinity's approach, delivery and training were fantastic - a first class service"

contact us>

....................................................................................................................................................................................................................................................................................................

John Wiley & Sons  Affinity Network Infrastructure case Study
 
  • 700 CAT6 Hellerman Tyton network outlets
  • Underground fibre ducts connection to other office site
  • Copper distribution cabinet
  • Network cabling connections & electrical power outlets
  • Outlets tested using a Fluke DTX 1800 cable tester

Affinity Network Infrastructure> 

  

 

 

 

 

 

Affinity installed over 700 CAT6 Hellerman Tyton network outlets into the Atrium building Southern Gate, Chicester,a new 5 storey office block. The building was connected back to the existing Wiley Offices in Southern Gate via an underground fibre duct.

"Affinity have continued to deliver on every project for us, their attention to detail and the ability to fit in with changing project plans has been very important to us" Head IT Wiley & Sons  

This email address is being protected from spambots. You need JavaScript enabled to view it.">email us

.....................................................................................................................................................................................................

 

DERBY college Affinity Microwave Link Case Study
 
  • 2 site City Microwave Link
  • Ceragon IP10 Licenced Microwave
  • Link operates at 28Ghz
  • Site Survey
  • Installation, mounting & building management liason
  • Maintenance & support

Affinity Point to Point Wireless Link>

 

 

 

 

 

 

 

Affinity's solution took into consideration future needs of the college, providing higher bandwidth and lowering operating costs.

The survey confirmed that some of the cable routes were challenging and roof mounting in one location required extensive collaboration with the landlords solicitors.

"Affinity's link has performed faultlessly, I recommend them"

......................................................................................................................................................................................

  

Hay Festival
Microwave point to point
  • Point to point microwave link
  • Ecommerce & data
  • Parallel back up link
  • Installation & mounting
  • Site survey & full design brief
  • 2 day installation

 

 

Whatever You need we'll get you talking - Call 0800 8402033

 

 

Visitors and Journalists to the festival, all want high speed connectivity to the internet. These demands coupled with the requirement to support credit card and ecommerce transactions at the festival during the show place heavy demands on the Festivals internet connectivity.

Due to the distance of the Festival site from the local telephone exchange and the area's very rural nature, high speed fibre broadband is not available. The Festival IT team needed a solution to improve the connectivity on site.

"The equipment took just days to install and has been fully operational now with no problems for two festival seasons - a great success"

...................................................................................................................................................................

ARRIVA plc
Microwave Link
  • Data collection from daily Bus Service
  • 24Ghz licence free system for interference immunity
  • bandwidth software licence up gradeable
  • Full parts and labour maintenance
  • 3 years trouble free installation

Excellent connectivity was required between two ARRIVA depots to collect telemenatry data from the bus fleet at the end of the day. In order to keep away from interference a 24Ghz Licence Free system was recomended operating at a bandwidth of 100 Mbps full duplex.

"Affinity's microwave link system has demonstrated its reliability with 3 years of trouble free installation - we're happy"
......................................................................................................................................................................................................................